A perfect match for trolley operations

Safeway Gannet 3D render

Meet Gannet. Made with trolley operations in mind.

Designed for installation on newbuild SOV’s, the Safeway Gannet is a perfect match for offshore wind farm O&M scope. Made with trolley operations in mind the Safeway Gannet has a stepless transfer and 1.2m transit width. Integrated into the vessel construction, Safeway Gannet still combines the advantages of the Seagull type with its hover mode, roll compensation, strongly reduced actuator motions and highest workability in the market.

Loadhandling 3D tip hoist including automatic hook
1000kg optionally 2000 kg
Safe Passage Personnel – Hover mode
2 persons simultaneously, 3 pers. Medivac
Minimum boom length
18 m
Maximum boom length
28 m
Freepassage width
Minimum 1.2 m
Vertical elevation stroke of bridge
10 m
Mass gangway
Approx. 75 mt
Mass HPU
Approx. 9.5 mt
Safe working conditions
Hs=3.5m at 25 m above Sea level
Operating air temperature 
-20°C to +55°C
Telescoping stroke of inner bridge
±5 meter including 1m safety margin
Max. telescoping speed
<2.0m/s under all operating conditions
Power installed (HPU)
240kW
Power consumed
Typically 85 kW - 100 kW
Required power supply
440V / 3 Ph / 60 Hz
Classification
Bureau Veritas

back to gangways